Roadworks & Traffic Interruptions

Traffic interruptions

Ipswich Road
08 January — 11 January
Delays likely Diversion route
Name:  Diversion
Location:  Charsfield Road
Description:  Streetworks / License - Streetworks
Responsibility for event:  Suffolk
Current status:  Planned

Low Road
10 January — 12 January
Delays likely Diversion route
Name:  Diversion
Location:  White Womans Lane
Description:  Streetworks / License - Streetworks
Responsibility for event:  Suffolk
Current status:  Planned

Low Road
10 January — 12 January
Delays likely Road closure
Name:  Low Road
Location:  Low Road
Description:  Streetworks / License - Streetworks
Responsibility for event:  Suffolk
Current status:  Planned

Roadworks

A1152 Woods Lane, Melton, Suffolk
08 January — 14 April
Delays likely Road closure
Works location:  woods lane- A1152
Works description:  installation of full road closure to carry out construction of new housing estate bell mouth access...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SCCDCS00000941

A1152 Woods Lane, Melton, Suffolk
08 January — 14 April
Delays likely Road closure
Works location:  NEW DEVELOPMENT, WOODS LANE, MELTON, IP12 1JF...
Works description:  SECTION 50 - CONSTRUCTION OF NEW MANHOLES AND NEW SEWER...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SC0C7PB3465

Castle Hill, Eyke, Suffolk
10 January — 12 January
Delays likely Road closure
Works location:  Full length of the road....
Works description:  Carriageway Patching. 0730-1600...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  LY300CHE-DE-A

Low Road, Eyke, Suffolk
10 January — 12 January
Delays likely Road closure
Works location:  Full length of the road....
Works description:  Carriageway Patching. 0730-1600...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  LY300CHE-DE-B

Woodbridge Road, Debach, Suffolk
08 January — 11 January
Delays likely Road closure
Works location:  From junction with B1078 Ipswich Road to Looms Lane....
Works description:  Remedial drainage works....
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  LY300WRD-IC-A

B1079 Grundisburgh Road, Burgh, Suffolk
09 January — 11 January
Delays possible Traffic control (two-way signals)
Works location:  Fynn Hoo Farm
Works description:  Repair communication pipe...
Responsibility for works:  Anglian Water
Current status:  Planned work about to start
Works reference:  AD03153835535

Bredfield Road, Melton, Suffolk
08 January — 10 January
Delays possible Traffic control (multi-way signals)
Works location:  At junct of Bury Hill in 2 phases crossing the road, opposite Orchard close -1 phase, south of junct...
Works description:  TO LOCATE AND EXCAVATE TO CLEAR BLOCKAGES ON EXISTING BT UNDERGROUND INFRASTRUCTURE& EXCAVATE AND LA...
Responsibility for works:  Openreach
Current status:  Advanced planning
Works reference:  BC005KN1W0WOODBRIDGE-NS1

Bredfield Road, Melton, Suffolk
08 January — 10 January
Delays possible Traffic control (multi-way signals)
Works location:  on Beresford drive.
Works description:  TO LOCATE AND EXCAVATE TO CLEAR BLOCKAGES ON EXISTING BT UNDERGROUND INFRASTRUCTURE& EXCAVATE AND LA...
Responsibility for works:  Openreach
Current status:  Advanced planning
Works reference:  BC005KN1W0WOODBRIDGE-NS1

Bury Hill, Melton, Suffolk
08 January — 10 January
Delays possible Traffic control (multi-way signals)
Works location:  At the junction with Bredfield road on Bury Hill - 2 phases for a road closure....
Works description:  TO LOCATE AND EXCAVATE TO CLEAR BLOCKAGES ON EXISTING BT UNDERGROUND INFRASTRUCTURE& EXCAVATE AND LA...
Responsibility for works:  Openreach
Current status:  Advanced planning
Works reference:  BC005KN1W0WOODBRIDGE-NS2

Deben Road, Woodbridge, Suffolk
10 January — 10 January
Delays possible Traffic control (Stop/Go boards)
Works location:  Woodbridge Deben Road -O/S the Car Park...
Works description:  To lift manhole in public highway for maximum of one hour...
Responsibility for works:  Anglian Water
Current status:  Advanced planning
Works reference:  AD03910841-04-02/7

Pytches Road, Woodbridge, Suffolk
06 January — 07 January
Delays possible Traffic control (multi-way signals)
Works location:  OUTSIDE THE COACH HOUSE, PYTCHES ROAD, WOODBRIDGE,...
Works description:  SECTION 50 - GAS CONNECTIONS...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SC0C7PB3559

A1152 Woods Lane, Melton, Suffolk
08 January — 19 January
Delays unlikely Some carriageway incursion
Works location:  Within fway and cway on Woods Lane approx 70m j/o Bredfield Road...
Works description:  Works Under Sites Road Closure - Correct Defect on Road Crossing& Excavate Footway for Dual HV Conne...
Responsibility for works:  GAS TRANSPORTATION CO LTD
Current status:  Advanced planning
Works reference:  ZP011P93352N0018449/R2

A1152 Woods Lane, Melton, Suffolk
11 January — 12 January
Delays unlikely Some carriageway incursion
Works location:  opposite Maryland
Works description:  Proposed permanent reinstatement...
Responsibility for works:  Anglian Water
Current status:  Planned work about to start
Works reference:  AD030000010466876

B1079 Quay Street, Woodbridge, Suffolk
09 January — 10 January
Delays unlikely Some carriageway incursion
Works location:  approx 22m NW from the junc of QUAY SIDE and QUAY STREET on QUAY STREET...
Works description:  WOODBRIDGE - 401760 - Permanent Reinstatement - INTERIM TO PERMANENT - in FW...
Responsibility for works:  Openreach
Current status:  Planned work about to start
Works reference:  BC005MU1WBAUSEIBQHCRCD01

Beech Way, Woodbridge, Suffolk
04 January — 08 January
Delays unlikely Some carriageway incursion
Works location:  OUTSIDE 15 BEECH WAY WOODBRIDGE IP12 4BW...
Works description:  WOODBRIDGE - 463803 - PROVISON OF SERVICE - EXCAVATE AND LAY 8M DUCT AND BUILD 1 NEW JOINT BOX IN FW...
Responsibility for works:  Openreach
Current status:  Advanced planning
Works reference:  BC006MU1WBAUSEIBT4N0AN01

Bury Hill, Melton, Suffolk
06 January — 10 January
Delays unlikely Some carriageway incursion
Works location:  o/s 84 BURY HILL on BURY HILL...
Works description:  WOODBRIDGE - 400999 - Permanent Reinstatement - INTERIM TO PERMANENT - in FW...
Responsibility for works:  Openreach
Current status:  Planned work about to start
Works reference:  BC005MU1WBAUSEIBQGVFGP01

Byng Lane, Pettistree, Suffolk
04 January — 04 January
Delays unlikely Some carriageway incursion
Works location:  OUTSIDE SUNNYSIDE
Works description:  TO15 - POHTOLE REPAIRS...
Responsibility for works:  Suffolk
Current status:  Work in progress
Works reference:  LY300157494

California, Woodbridge, Suffolk
09 January — 11 January
Delays unlikely Some carriageway incursion
Works location:  Opposite 38 CALIFORNIA...
Works description:  WOODBRIDGE - 459040 - Provision of Service - Lay approx 4m of Duct 54/56 in footway/verge to link e...
Responsibility for works:  Openreach
Current status:  Advanced planning
Works reference:  BC006MU1WBAUSEIBT1H4LB01

Old Barrack Road, Woodbridge, Suffolk
09 January — 11 January
Delays unlikely Some carriageway incursion
Works location:  1
Works description:  Stoptap Replacements
Responsibility for works:  Anglian Water
Current status:  Planned work about to start
Works reference:  AD03153920523

Pytches Close, Melton, Suffolk
04 January — 08 January
Delays unlikely Some carriageway incursion
Works location:  8
Works description:  Stoptap Replacements
Responsibility for works:  Anglian Water
Current status:  Work in progress
Works reference:  AD03154379115

Pytches Road, Woodbridge, Suffolk
08 January — 19 January
Delays unlikely No carriageway incursion
Works location:  FROM JUNCTION OF THE GROVE TO JUST BEFORE CEDAR HOUSE, PYTCHES ROAD, WOODBRIDGE...
Works description:  SECTION 50 - ELECTRICAL CABLING...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SC0C7PB3560

Russell Close, Woodbridge, Suffolk
05 January — 11 January
Delays unlikely Some carriageway incursion
Works location:  from the junction of Manor Road to approx. 85m SE to outside no 8 Russell Close....
Works description:  WOODBRIDGE 456574 - Overlay - PLANNED MAINTAINENCE - PROVIDE APPROX 85M OF DUCT IN FW/CW...
Responsibility for works:  Openreach
Current status:  Advanced planning
Works reference:  BC006MU1WBAUSEIBRWFVFW01

Saddlemakers Lane, Melton, Suffolk
05 January — 05 January
Delays unlikely Some carriageway incursion
Works location:  FULL LENGTH OF ROAD
Works description:  REPAIR GIVE WAY SIGN
Responsibility for works:  Suffolk
Current status:  Work in progress
Works reference:  LY300SMTO

Saddlemakers Lane, Melton, Suffolk
08 January — 09 January
Delays unlikely Some carriageway incursion
Works location:  Saddlemakers lane / New road...
Works description:  Installation of TO15 to carry out temporary signage works in preparation for the return of woods lan...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SCCDCS00001209

Sandy Lane, Martlesham, Suffolk
08 January — 02 June
Delays unlikely No carriageway incursion
Works location:  625976, 247756, SANDY LANE, MARTLESHAM...
Works description:  SECTION 50-IBERDROLA-HDD10-HORIZONTAL DIRECTIONAL DRILL UNDERNEATH THE FULL EXTENT OF SANDY LANE (4....
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SC0C7PB3537

Seckford Street, Woodbridge, Suffolk
07 January — 03 March
Delays unlikely No carriageway incursion
Works location:  O/S No: 36
Works description:  Scaffold Licence - O/S No: 36...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SCCLAL-MAIN-00020950

Sun Lane, Woodbridge, Suffolk
05 January — 08 January
Delays unlikely Some carriageway incursion
Works location:  O/S Sub Station. c\w....
Works description:  Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-600mm):Excavate 1 x Joint hole for a new...
Responsibility for works:  UK POWER NETWORKS EASTERN & LONDON
Current status:  Advanced planning
Works reference:  EC30034783284

Sun Lane, Woodbridge, Suffolk
12 January — 15 January
Delays unlikely Some carriageway incursion
Works location:  Near River Cottage
Works description:  proposed permanent reinstatement...
Responsibility for works:  Anglian Water
Current status:  Planned work about to start
Works reference:  AD030000010450045

The Grove, Melton, Suffolk
08 January — 19 January
Delays unlikely No carriageway incursion
Works location:  CORNER AND JUNCTION WITH PYTCHES ROAD, THE GROVE, MELTON,...
Works description:  SECTION 50 - EXCAVATE AND LAY ELECTRIC CABLE...
Responsibility for works:  Suffolk
Current status:  Advanced planning
Works reference:  SC0C7PB3584

Walnuts Lane, Wickham Market, Suffolk
05 January — 05 January
Delays unlikely Some carriageway incursion
Works location:  NORTH OF HALL
Works description:  TO15 - POTHOLE REPAIRS...
Responsibility for works:  Suffolk
Current status:  Work in progress
Works reference:  LY300157142-A

By Anne Henderson on January 9th, 2018